{"id":103894,"date":"2016-07-18T09:00:09","date_gmt":"2016-07-18T14:00:09","guid":{"rendered":"http:\/\/csinewsnow.com\/?p=103894"},"modified":"2016-07-18T09:54:38","modified_gmt":"2016-07-18T14:54:38","slug":"i-94-construction-eb-casselton-mapleton","status":"publish","type":"post","link":"http:\/\/csinewsnow.com\/?p=103894","title":{"rendered":"I-94 construction"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-medium wp-image-4261\" src=\"http:\/\/csinewsnow.com\/wp-content\/uploads\/2012\/09\/roadworkI94-300x201.png\" alt=\"roadworkI94\" width=\"300\" height=\"201\" srcset=\"http:\/\/csinewsnow.com\/wp-content\/uploads\/2012\/09\/roadworkI94-300x201.png 300w, http:\/\/csinewsnow.com\/wp-content\/uploads\/2012\/09\/roadworkI94-260x175.png 260w, http:\/\/csinewsnow.com\/wp-content\/uploads\/2012\/09\/roadworkI94.png 445w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/>Bismarck (CSi) The NDDOT informs motorists that construction begins July 18, 206 on the eastbound lane of I-94 between Casselton and Mapleton<\/p>\n<p>Construction on this project has been delayed and is now scheduled to begin on that date. The project will consist of concrete pavement repair and shoulder repair.<\/p>\n<p>During Construction<\/p>\n<p>\u00b7 A lane closure will be in place through the construction zone<\/p>\n<p>\u00b7 Speeds will be reduced 65 mph for the project length and to 40 mph through the work zone<\/p>\n<p>\u00b7 A 15 ft. width restriction will be in place<\/p>\n<p>\u00b7 Flaggers will be onsite directing traffic as needed<\/p>\n<p>\u00b7 Oil may be present on the shoulders of the roadway<\/p>\n<p>\u00b7 Motorists can expect delays of up to 15 minutes<\/p>\n<p>The project is expected to be complete this fall.<\/p>\n<p>For more information about construction projects and road conditions throughout North Dakota, call 511 from any type of phone or visit the Travel Information Map on the NDDOT website at <a href=\"http:\/\/www.dot.nd.gov\/travel-info-v2\/\">http:\/\/www.dot.nd.gov\/travel-info-v2\/<\/a><\/p>\n<p>Also&#8230;<\/p>\n<p>A construction project will begin Monday, July 18, on the westbound lane of I-94 at the Maple River Bridge near Casselton. The project will be about \u00bd mile long and consist of a deck repair.<\/p>\n<p>&nbsp;<\/p>\n<p><strong>During Construction<\/strong><\/p>\n<ul>\n<li>A\u00a0 lane closure will be in place through the construction zone<\/li>\n<li>Speeds will be reduced 65 mph for the project length and to 40 mph through the work zone where workers are present<\/li>\n<li>A 15 ft. width restriction will be in place<\/li>\n<li>Flaggers will be onsite directing traffic as needed<\/li>\n<li>Motorists can expect delays short delays<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p>The project is expected to take a couple of weeks.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Bismarck (CSi) The NDDOT informs motorists that construction begins July 18, 206 on the eastbound lane of I-94 between Casselton and Mapleton Construction on this project has been delayed and is now scheduled to begin on that date. The project will consist of concrete pavement repair and shoulder repair. During [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":101798,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[35],"tags":[],"class_list":["post-103894","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-state"],"_links":{"self":[{"href":"http:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/posts\/103894","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"http:\/\/csinewsnow.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=103894"}],"version-history":[{"count":3,"href":"http:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/posts\/103894\/revisions"}],"predecessor-version":[{"id":104357,"href":"http:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/posts\/103894\/revisions\/104357"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/media\/101798"}],"wp:attachment":[{"href":"http:\/\/csinewsnow.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=103894"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/csinewsnow.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=103894"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/csinewsnow.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=103894"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}