{"id":222931,"date":"2021-04-12T16:44:26","date_gmt":"2021-04-12T21:44:26","guid":{"rendered":"http:\/\/csinewsnow.com\/?p=222931"},"modified":"2021-04-12T16:59:56","modified_gmt":"2021-04-12T21:59:56","slug":"road-diet-project-work-scheduled","status":"publish","type":"post","link":"http:\/\/csinewsnow.com\/?p=222931","title":{"rendered":"Road Diet Project work scheduled"},"content":{"rendered":"<p><a href=\"http:\/\/csinewsnow.com\/wp-content\/uploads\/2021\/04\/Road-Diet-Interstate-Engineering1.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-medium wp-image-223269\" src=\"http:\/\/csinewsnow.com\/wp-content\/uploads\/2021\/04\/Road-Diet-Interstate-Engineering1-300x194.jpg\" alt=\"\" width=\"300\" height=\"194\" srcset=\"http:\/\/csinewsnow.com\/wp-content\/uploads\/2021\/04\/Road-Diet-Interstate-Engineering1-300x194.jpg 300w, http:\/\/csinewsnow.com\/wp-content\/uploads\/2021\/04\/Road-Diet-Interstate-Engineering1-768x497.jpg 768w, http:\/\/csinewsnow.com\/wp-content\/uploads\/2021\/04\/Road-Diet-Interstate-Engineering1-1024x662.jpg 1024w, http:\/\/csinewsnow.com\/wp-content\/uploads\/2021\/04\/Road-Diet-Interstate-Engineering1-270x175.jpg 270w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a>Jamestown\u00a0 (CSi)\u00a0\u00a0 Weather permitting, the Jamestown Road Diet project the week of April 12 will begin storm sewer work, to include five intersections. The initial three week phase will be followed by concrete prep work.<\/p>\n<p>Also this week, the disconnected traffic lights will be removed.\u00a0 The signals at Third Street to be reinstalled in June.<\/p>\n<p>Starting at Seventh\u00a0 Street South,\u00a0 crews will begin removing\u00a0 one quadrant of each intersection at a time, and keeping pedestrians moving along, continuing north on First Avenue, then going west.\u00a0 At the same time, electrical work will be going on.<\/p>\n<p>Ti-Zack Concrete Inc. spokesman Chris Hartwig adds, traffic signs will be posted for motorists and pedestrians to follow.<\/p>\n<p>The finished project will include bump-outs at each intersection, at the two-lane roadway, on land in each direction, with a dedicated left-turn lane as indicated by the temporary pavement markings.\u00a0 Flashing beacons will assist pedestrians crossing at Fifth Street South, Second Street South, Third Street North, and Fourth Avenue Northwest.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Jamestown\u00a0 (CSi)\u00a0\u00a0 Weather permitting, the Jamestown Road Diet project the week of April 12 will begin storm sewer work, to include five intersections. The initial three week phase will be followed by concrete prep work. Also this week, the disconnected traffic lights will be removed.\u00a0 The signals at Third Street [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":223269,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[25],"tags":[],"class_list":["post-222931","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-featured"],"_links":{"self":[{"href":"http:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/posts\/222931","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"http:\/\/csinewsnow.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=222931"}],"version-history":[{"count":6,"href":"http:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/posts\/222931\/revisions"}],"predecessor-version":[{"id":223278,"href":"http:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/posts\/222931\/revisions\/223278"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/media\/223269"}],"wp:attachment":[{"href":"http:\/\/csinewsnow.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=222931"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/csinewsnow.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=222931"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/csinewsnow.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=222931"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}