{"id":238059,"date":"2021-11-01T09:55:01","date_gmt":"2021-11-01T14:55:01","guid":{"rendered":"http:\/\/csinewsnow.com\/?p=238059"},"modified":"2021-11-01T11:22:30","modified_gmt":"2021-11-01T16:22:30","slug":"city-hall-roofing-project-completed","status":"publish","type":"post","link":"http:\/\/csinewsnow.com\/?p=238059","title":{"rendered":"City Hall roofing project completed"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-medium wp-image-19308\" src=\"http:\/\/csinewsnow.com\/wp-content\/uploads\/2013\/05\/City-Hall-4-300x202.jpg\" alt=\"\" width=\"300\" height=\"202\" srcset=\"http:\/\/csinewsnow.com\/wp-content\/uploads\/2013\/05\/City-Hall-4-300x202.jpg 300w, http:\/\/csinewsnow.com\/wp-content\/uploads\/2013\/05\/City-Hall-4-259x175.jpg 259w, http:\/\/csinewsnow.com\/wp-content\/uploads\/2013\/05\/City-Hall-4.jpg 445w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/>Jamestown\u00a0 (CSi)\u00a0 Jamestown Mayor Dwaine Heinrich says the new roofing installation is finished at City Hall.<\/p>\n<p>On Monday\u2019s Wayne Byers Show on CSi Cable 2, he said the cedar shake shingles, original to the building has been replaced by a stone and steel covering, expected to last around 75 years under normal conditions. The cost of the project, with funds from the city\u2019s Buildings Site budget was $148,000.<\/p>\n<p>The Mayor Added that the new water line has been installed under the James River, with no problems encountered with the boring, with the connections to be completed when parts arrive.<\/p>\n<p>Mayor Heinrich said when the North Dakota Legislature meets in Special Session on Monday November 8, under consideration will be allocating $1-Billion Dollars in federal allocations.\u00a0 Once allocated Jamestown will request a grant from the State Water Commission, for water and sewer improvements, at about $75-millon.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Jamestown\u00a0 (CSi)\u00a0 Jamestown Mayor Dwaine Heinrich says the new roofing installation is finished at City Hall. On Monday\u2019s Wayne Byers Show on CSi Cable 2, he said the cedar shake shingles, original to the building has been replaced by a stone and steel covering, expected to last around 75 years [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":66331,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[25,14],"tags":[],"class_list":["post-238059","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-featured","category-jamestown"],"_links":{"self":[{"href":"http:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/posts\/238059","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"http:\/\/csinewsnow.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=238059"}],"version-history":[{"count":2,"href":"http:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/posts\/238059\/revisions"}],"predecessor-version":[{"id":238068,"href":"http:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/posts\/238059\/revisions\/238068"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/media\/66331"}],"wp:attachment":[{"href":"http:\/\/csinewsnow.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=238059"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/csinewsnow.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=238059"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/csinewsnow.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=238059"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}