{"id":238121,"date":"2021-11-01T21:59:51","date_gmt":"2021-11-02T02:59:51","guid":{"rendered":"http:\/\/csinewsnow.com\/?p=238121"},"modified":"2021-11-02T08:42:07","modified_gmt":"2021-11-02T13:42:07","slug":"school-board-addresses-facility-projects-ecare-services","status":"publish","type":"post","link":"http:\/\/csinewsnow.com\/?p=238121","title":{"rendered":"School Board addresses facility projects, eCare services"},"content":{"rendered":"<p>(CSi)\u00a0 The Jamestown Public School Board Monday was updated by Superintendent, Dr. Robert Lech about\u00a0facility projects.<\/p>\n<p>Meetings continue with with architects and engineers during the design phase projects planned\u00a0 in the Summer of 2022 at Jamestown High School, Jamestown Middle School, and Gussner Elementary school.<\/p>\n<p>The concern now is with the planning stage turnaround time on prefabricated metal buildings.<\/p>\n<p>In other business, Superintendent Lech\u00a0 has received a cost proposal from the Avel eCare services, which he believes\u00a0 will address some gaps in the districts coverage.\u00a0 eCare would provide services in one pilot elementary building, using one nurse in one building, recommended for Louis L&#8217;Amour School.\u00a0\u00a0 He feels\u00a0 the school board should\u00a0 move ahead with the pilot if even if a grant was not available.<\/p>\n<p>The school board unanimously approved to look into the eCare services pilot program.<\/p>\n<p><iframe loading=\"lazy\" title=\"Jamestown School Board November 01, 2021\" width=\"500\" height=\"281\" src=\"https:\/\/www.youtube.com\/embed\/gcJAEPBLVOQ?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe><\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>(CSi)\u00a0 The Jamestown Public School Board Monday was updated by Superintendent, Dr. Robert Lech about\u00a0facility projects. Meetings continue with with architects and engineers during the design phase projects planned\u00a0 in the Summer of 2022 at Jamestown High School, Jamestown Middle School, and Gussner Elementary school. The concern now is with [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":238167,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[14],"tags":[],"class_list":["post-238121","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-jamestown"],"_links":{"self":[{"href":"http:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/posts\/238121","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"http:\/\/csinewsnow.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=238121"}],"version-history":[{"count":2,"href":"http:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/posts\/238121\/revisions"}],"predecessor-version":[{"id":238154,"href":"http:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/posts\/238121\/revisions\/238154"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/media\/238167"}],"wp:attachment":[{"href":"http:\/\/csinewsnow.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=238121"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/csinewsnow.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=238121"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/csinewsnow.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=238121"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}