{"id":27824,"date":"2013-12-04T08:00:15","date_gmt":"2013-12-04T14:00:15","guid":{"rendered":"http:\/\/csinewsnow.com\/?p=27824"},"modified":"2013-12-06T17:03:21","modified_gmt":"2013-12-06T23:03:21","slug":"sewer-project-road-openings","status":"publish","type":"post","link":"http:\/\/csinewsnow.com\/?p=27824","title":{"rendered":"1st St &#038; 3rd Av SW Intersection Open"},"content":{"rendered":"<p><a href=\"http:\/\/csinewsnow.com\/wp-content\/uploads\/2013\/12\/2ndClose4AV445.png\"><img loading=\"lazy\" decoding=\"async\" class=\"alignright size-medium wp-image-33672\" alt=\"2ndClose4AV445\" src=\"http:\/\/csinewsnow.com\/wp-content\/uploads\/2013\/12\/2ndClose4AV445-300x202.png\" width=\"300\" height=\"202\" srcset=\"http:\/\/csinewsnow.com\/wp-content\/uploads\/2013\/12\/2ndClose4AV445-300x202.png 300w, http:\/\/csinewsnow.com\/wp-content\/uploads\/2013\/12\/2ndClose4AV445-259x175.png 259w, http:\/\/csinewsnow.com\/wp-content\/uploads\/2013\/12\/2ndClose4AV445.png 445w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a>Dec 4:\u00a0\u00a0\u00a0\u00a0Construction crews have filled in the remaining open trench on 3rd Av SW.\u00a0 3rd Av SW is open, from 2nd St SW, north\u00a0to 1st St. The intersection at 1st St &amp; 3rd Av SW is now open. The 2nd St SW bridge remains closed, use the detour to 1st Street.<\/p>\n<p>Motorists can now enter &amp; exit Historic Franklin School parking lot and drive-up payment box normally. <span><span>Nov 21 <\/span><\/span><\/p>\n<p>3rd Street SE is temporarily open from 11th Ave SE to Railroad Drive E. This area will close again on Friday, November 22.<\/p>\n<p>2nd St SW open to local traffic only from 5th Ave SW to the bridge. 12th Ave SE open from 5th St SE to 6th St SE.<\/p>\n<p>\u00a0Updates will be posted online at jamestownsewerproject.com.<\/p>\n<p>Motorists and residents are advised that work is taking place on November 20 on 19th Ave SE. Work begins at 10th St SE and extends south for about three blocks. Drivers should use caution in this area and be aware of equipment and workers.<\/p>\n<p>A reminder, the intersection of <strong>1st Street SW and 3rd Avenue SW, near Renaissance Recycling<\/strong><b><b>, is closed for construction. A detour is in place and access will be provided for area businesses during this time.<\/b><\/b><\/p>\n<p>To enter CSi, customers are reminded to go west on<\/p>\n<p><strong>2nd St SW to 4th Ave SW, go north 1\/2 block and enter the CSi parking lot from the west.<\/strong><\/p>\n<p>With the closing of the 1st Street intersection, the detour to access west of the river is via 2nd Street to 4th Ave, up to 1st Street to use the 1st Street bridge. 2nd St SW bridge will remain closed for 3 more weeks or longer while lift station work is being done.<\/p>\n<p>A map and project updates are online at jamestownsewerproject.com, accessible on line at CsiNewsNow.com Updates on The Wayne Byers Show on CSi Cable 2.<\/p>\n<p>Questions on the Jamestown sanitary sewer project can be directed to Darrell Hournbuckle with Interstate Engineering at (701) 252-0234.<\/p>\n<p>&nbsp;<\/p>\n<p>Jamestown (CSi\u00a0 Nov 18) With the Jamestown Sanitary Sewer Project, Interstate Engineering reports 12th Ave SE is closed from 3rd St SE to 6th St SE. 7th St SE is open from 12th Ave SE to 13th Ave SE. More at <a href=\"http:\/\/jamestownsewerproject.com\/\">jamestownsewerproject.com<\/a><\/p>\n<p>A reminder, the intersection of <strong>1st Street SW and 3rd Avenue SW, near Renaissance Recycling<\/strong>, is closed for construction. A detour is in place and access will be provided for area businesses during this time.<\/p>\n<p>To enter CSi, customers are reminded to go west on <strong>2nd St SW to 4th Ave SW, go north 1\/2 block and enter the CSi parking lot from the west.<\/strong><\/p>\n<p>With the closing of the 1st Street intersection, the detour to access west of the river is via 2nd Street to 4th Ave, up to 1st Street to use the 1st Street bridge.\u00a0 2nd St SW bridge will remain closed for 3 more weeks or longer while lift station work is being done.<\/p>\n<p>A map and project updates are online at jamestownsewerproject.com, accessible on line at CsiNewsNow.com Updates on The Wayne Byers Show on CSi Cable 2.<\/p>\n<p>Questions on the Jamestown sanitary sewer project can be directed to Darrell Hournbuckle with Interstate Engineering at (701) 252-0234.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>Jamestown, ND (CSi Nov 5, 2013) \u2014 With the Jamestown sanitary sewer project, Interstate Engineering reports the intersection of <strong>1st Street SW and 3rd Avenue SW, near Renaissance Recycling<\/strong><b>, is closed for construction on Wednesday, November 6, 2013. This closure is expected to be in place for<\/b><strong> two weeks<\/strong><b><b>. A detour is in place and access will be provided for area businesses during this time.<\/b><\/b><\/p>\n<p>3rd Ave NW is open for about a half block south starting at 3rd St NW.<\/p>\n<p>To enter CSi, customers are reminded to go west on 2nd St SW to 4th Ave SW, go north 1\/2 block and enter the CSi parking lot from the west.<\/p>\n<p>With the closing of the 1st Street intersection, the detour to access west of the river will be via 2nd Street to 4th Ave, up to 1st Street to use the 1st Street bridge.<\/p>\n<p>The intersection of 17th St SE and 19th Ave SE opened Wednesday afternoon.<\/p>\n<p>10th Street SE is open from 15th Avenue SE to 19th Avenue SE.<\/p>\n<p>Questions can be directed to Darrell Hournbuckle with Interstate Engineering at (701) 252-0234.<\/p>\n<p>View the construction map at:<\/p>\n<p><a href=\"http:\/\/www.jamestownsewerproject.com\/\"><b>jamestownsewerproject.com<\/b><\/a><\/p>\n<p>&nbsp;<\/p>\n<p>Oct 29, 2013<\/p>\n<p>Jamestown, ND &#8212; (KCSi-T.V. News\u00a0Oct\u00a029, 2013) &#8212; Interstate Engineering reports, 19th Avenue SE is now open from 10th St SE to 17th Street SE. View the construction map for details: <a href=\"http:\/\/www.jamestownsewerproject.com\/\">jamestownsewerproject.com<\/a><\/p>\n<p>10th St SE is now closed from 15th Ave SE to 19thThis closure is expected to be in place for about one week.<\/p>\n<p>Motorists are able to access Gerdau Recycling from the west.<\/p>\n<p>A reminder, \u00a0<strong>2nd St SW from 3rd Ave SW to 4th Ave SW was opened Tuesday<\/strong> afternoon.\u00a0\u00a0 The 2nd St SW bridge over the James River remains closed.\u00a0\u00a0 Enter CSi from 4th Av SW.<\/p>\n<p>Project updates are posted online at jamestownsewerproject.com, accessible on line at CSiNewsNow.com and updates on\u00a0The Wayne Byers Show on CSi Cable 2.<\/p>\n<p>Questions can be directed to Darrell Hournbuckle with Interstate Engineering at (701) 252-0234.<\/p>\n<p>He says, the sewer pipe work and lift station construction are on schedule to be completed in February, which the original completion date. some of the road resurfacing is behind schedule because of recent rains and may have to be done in the spring,and will be temporarily covered in gravel over the winter.<\/p>\n<p>Work on lift station\u00a0number nine\u00a0, in the Jamestown Business Center parking lot, is still on schedule, construction on the above-ground structure will begin, scheduled to end in February.<\/p>\n<p>&nbsp;<\/p>\n<p>Oct 28, 2013..<\/p>\n<p><span><span>Jamestown, ND (KCSi-T.V. News Oct 28, 2013) \u2013 Interstate Engineering reports section of 19th Avenue SE is closed for construction. The closure begins at 10th Street SE and extends south for about two blocks. This closure is expected to be in place for about two weeks. During this time, area businesses can be accessed from the south via 17th Street SE. <\/span><\/span><\/p>\n<p>19th Ave SE is open from about two blocks south of 10th St SE to 17th St SE. Temporary surfacing is in place.<\/p>\n<p>Updates will be posted online at jamestownsewerproject.com accesible through CsiNewsNow.com. Updates on The Wayne Byers Show, on CSi Cable 2.<\/p>\n<p>Questions can be directed to Darrell Hournbuckle with Interstate Engineering at (701) 252-0234.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>Oct 25, 2013&#8230;<\/p>\n<p>Jamestown, ND (KCSi- T.V News Oct 25, 2013) \u2013 With the Jamestown sanitary sewer project, \u00a0Interstate Engineering reports that 1st St SE is open from 4th Ave SE to 7th Ave SE. <a href=\"http:\/\/jamestownsewerproject.com\/\">jamestownsewerproject.com<\/a><\/p>\n<p>A section of 12th Avenue SE closes Friday for construction.<\/p>\n<p>12th Avenue SE\u00a0 closes from 7th Street SE to 5th Street SE. This closure is expected to be in place for about two weeks.<\/p>\n<p>Interstate Engineering reports, a road closure on 7th Street SE near WedgeCor will be extended Friday. The closure, located at 7th Street SE and 13th Avenue SE, will be extended west to 12th Avenue SE.This closure is expected to be in place for about two weeks.<\/p>\n<p>A reminder, \u00a0<strong>2nd St SW from 3rd Ave SW<a href=\"http:\/\/csinewsnow.com\/wp-content\/uploads\/2013\/10\/3rdClosedA.png\"><img loading=\"lazy\" decoding=\"async\" class=\"alignright size-medium wp-image-30276\" alt=\"3rdClosedA\" src=\"http:\/\/csinewsnow.com\/wp-content\/uploads\/2013\/10\/3rdClosedA-300x202.png\" width=\"300\" height=\"202\" srcset=\"http:\/\/csinewsnow.com\/wp-content\/uploads\/2013\/10\/3rdClosedA-300x202.png 300w, http:\/\/csinewsnow.com\/wp-content\/uploads\/2013\/10\/3rdClosedA-259x175.png 259w, http:\/\/csinewsnow.com\/wp-content\/uploads\/2013\/10\/3rdClosedA.png 445w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a> to 4th Ave SW was opened Tuesday<\/strong> afternoon.\u00a0\u00a0 The 2nd St SW bridge over the James River remains closed.\u00a0\u00a0 Enter CSi from 4th Av SW.<\/p>\n<p>Updates will be posted online at jamestownsewerproject.com, and CSiNewsNow.com, and on\u00a0The Wayne Byers Show on CSi Cable 2.<\/p>\n<p>Questions can be directed to Darrell Hournbuckle with Interstate Engineering at (701) 252-0234.<\/p>\n<p>&nbsp;<\/p>\n<p>Oct 24, 2013<\/p>\n<p>Jamestown, ND (KCSi-T.V. News) &#8212; With the Jamestown sanitary sewer project, Interstate Engineering reports, a road closure on 7th Street SE near WedgeCor will be extended Friday. The closure, located at 7th Street SE and 13th Avenue SE, will be extended west to 12th Avenue SE.This closure is expected to be in place for about two weeks.<\/p>\n<p>Oct 22:\u00a0 <strong>2nd St SW from 3rd Ave SW to 4th Ave SW was opened Tuesday<\/strong> afternoon.\u00a0\u00a0 The 2nd St SW bridge over the James River remains closed.\u00a0\u00a0 Enter CSi from 4th Av SW.<\/p>\n<p>Oct 21:\u00a0 \u00a0Jamestown, ND (KCSi-T.V. News) \u00a0\u2013 Starting Monday, a section of 7th Street SE, at the intersection of 13th Avenue SE, will close due to construction. 7th Street SE will close from WedgCor to the west side of the railroad tracks. This closure is expected to last for two weeks.<\/p>\n<p>Updates will be posted online at <a title=\"Sewer Map\" href=\"http:\/\/www.JamestownSewerProject.com\" target=\"_blank\">JamestownSewerProject.com<\/a> , available through CSiNewsNow.com, and on the Wayne Byers Show on CSi Cable 2.<\/p>\n<p>Questions can be directed to Darrell Hournbuckle with Interstate Engineering at (701) 252-0234.<\/p>\n<p>Oct 21, 2013<\/p>\n<p>Closures near the Business Center &amp; 10th Street SE are now open. View the construction map for details<\/p>\n<p>Oct 17, 2013<\/p>\n<p>Jamestown, ND\u00a0 (KCSi-T.V. News Oct 17, 2o13)\u00a0\u00a0 With the Jamestown sanitary sewer project, Interstate Engineering reports, the intersection of 4<sup>th<\/sup> Street NE and 2<sup>nd<\/sup> Avenue NE on Highway 20 near the Jamestown Business Center is closed due to construction. A detour is in place using 5<sup>th<\/sup> Street NE. The closure is expected to last for one day.<\/p>\n<p>A section of 10th Street SE is also closed from the railroad tracks near 15th Avenue SE to 19th Avenue SE. A detour and flaggers will be in place on 19th Avenue SE. This closure is expected to last for one day.<\/p>\n<p>Updates will be posted online at jamestownsewerproject.com.\u00a0 Questions can be directed to Darrell Hournbuckle with Interstate Engineering at (701) 252-0234.<\/p>\n<p>Updates on The Wayne Byers Show on CSi Cable 2.<\/p>\n<p>A reminder, 2nd St SW from Post Office to River remains closed, as is 3rd Av SW from 2nd St SW to 1st St SW.\u00a0 USE 4th Ave SW to enter CSi Cable &amp; Computers at Historic Franklin.<\/p>\n<p>Oct 14, 2013<\/p>\n<p>The 10th St SE closure scheduled for Monday from 15th Ave SE \u2013 19th Ave SE is delayed due to rain. Updates will be provided when available.\u00a0 More at <a title=\"Map\" href=\"http:\/\/www.jamestownsewerproject.com\" target=\"_blank\">JamestownSewerProject.com <\/a><\/p>\n<p>&nbsp;<\/p>\n<p>Oct 11, 2013<\/p>\n<p><span><span>Jamestown, ND\u00a0 (KCSi- T.V. \u00a0News Oct 11, 2013) \u2013 With the Jamestown Sanitary Sewer Project, Interstate Engineering reports that starting on Monday, October 14, 2013, a section of 10th Street SE, near the railroad tracks, is expected to close as part of the Jamestown sanitary sewer project. <\/span><\/span><\/p>\n<p>10th Street SE will be closed from the railroad tracks near 15th Avenue SE to 19th Avenue SE.<\/p>\n<p>A detour and flaggers will be in place on 19th Avenue SE. This closure is expected to last for one day.<\/p>\n<p>Updates will be posted online at jamestownsewerproject.com., and CSiNewsNow.com and on The Wayne Byers Show on CSi Cable 2.<\/p>\n<p>Questions on the Jamestown sanitary sewer project can be directed to Darrell Hournbuckle with Interstate Engineering at (701) 252-0234<\/p>\n<p>Oct 9, 2013<\/p>\n<p>Jamestown, ND (KCSi-T.V. News\u00a0Oct 8, 2013)\u00a0 \u00a0\u2013 Interstate Enginering reports, the intersection of 1st St SE and 2nd Ave SE is closed, except for local traffic. Project updates at <a href=\"http:\/\/jamestownsewerproject.com\/\">jamestownsewerproject.com<\/a><\/p>\n<p>Oct 8, 2013<\/p>\n<p align=\"left\">\u00a0Jamestown, ND (KCSi-T.V. News\u00a0Oct 8, 2013)\u00a0 \u00a0\u2013 Interstate Enginering reports, starting\u00a0Wednesday (Oct 9, 2013) \u00a0the intersection of 17th Street SE (County Road 39) and 19th Avenue SE\u00a0 is \u00a0partially closed as part of the Jamestown sanitary sewer project. 17th Street SE (County Road 39) will be reduced to one lane of traffic during working hours. Flaggers\u00a0are also present.<\/p>\n<p>Motorists\u00a0are still \u00a0able to access to the City of Jamestown Baling Facility during this time.<\/p>\n<p>At this time, this partial closure is expected to be in place for up to three days. Updates will be posted online at jamestownsewerproject.com.<\/p>\n<p>Questions on the Jamestown sanitary sewer project can be directed to Darrell Hournbuckle with Interstate Engineering at (701) 252-0234.<\/p>\n<p>Oct 7, 2013<\/p>\n<p>Jamestown, ND (KCSi-T.V. News Oct 7, 2013) \u2013 With the Jamestown Sanitary Sewer Project, Interstate Engineering reports, residents and motorists are advised that starting Monday (Oct 7, 2013), a section of 3rd Avenue NW is expected to close for pavement replacement as part of the Jamestown sanitary sewer project.<\/p>\n<p>3rd Avenue NW will close from 6th Street NW to 9th Street NW. The streets that intersect 3rd Avenue NW in this area will remain open during this time.<\/p>\n<p>This closure is expected to be in place for about one week. Updates will be posted online at jamestownsewerproject.com.<\/p>\n<p>Crews are working in the area of 17th St SE and 19th Ave SE.<\/p>\n<p>Questions on the Jamestown sanitary sewer project can be directed to Darrell Hournbuckle with Interstate Engineering at (701) 252-0234.<\/p>\n<p>On line visit www.CsiNewsNow.com with links to<\/p>\n<p><a href=\"http:\/\/www.jamestownsanitarysewerproject.com\/\"><b>www.jamestownsanitarysewerproject.com<\/b><\/a><\/p>\n<p>Updates also on The Wayne Byers Show, on CSi Cable 2.<\/p>\n<p>Oct 6, 2013<\/p>\n<p>1st St SE near Jamestown Plumbing open to local traffic only.<\/p>\n<p>Update Oct. 2, 2013 From Interstate Engineering&#8230; The intersection of 17th St SE and 19th Ave SE is open. Project updates\u00a0 will be posted online at <a title=\"Project Map\" href=\"http:\/\/jamestownsewerproject.com\" target=\"_blank\"><b>JamestownSewerProject.com<\/b><\/a>\u00a0and at CsiNewsNow.com and on the Wayne Byers Show on CSi Cable 2.Questions on the Jamestown sanitary sewer project can be directed to Darrell Hournbuckle with Interstate Engineering at (701) 252-0234.<\/p>\n<p><a href=\"http:\/\/csinewsnow.com\/wp-content\/uploads\/2013\/09\/2nd3rdClosed.png\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-27883\" alt=\"2nd3rdClosed\" src=\"http:\/\/csinewsnow.com\/wp-content\/uploads\/2013\/09\/2nd3rdClosed.png\" width=\"445\" height=\"300\" srcset=\"http:\/\/csinewsnow.com\/wp-content\/uploads\/2013\/09\/2nd3rdClosed.png 445w, http:\/\/csinewsnow.com\/wp-content\/uploads\/2013\/09\/2nd3rdClosed-300x202.png 300w, http:\/\/csinewsnow.com\/wp-content\/uploads\/2013\/09\/2nd3rdClosed-259x175.png 259w\" sizes=\"auto, (max-width: 445px) 100vw, 445px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p>Sept 27:\u00a0 Interstate Engineering reports<\/p>\n<p><strong>2nd Street SW<\/strong> &#8211; remains\u00a0closed from 3rd Av SW to river.\u00a0 Use 1st Street bridge detour.<\/p>\n<p><strong>3rd Ave SW<\/strong> &#8211; remains closed from 2nd St SW to 1st St SW.\u00a0\u00a0 <strong>Use 4th Av SW to enter &amp; exit CSi parking lot at Historic Franklin School.<\/strong><\/p>\n<p><strong>1st Street SE<\/strong>, near Jamestown Plumbing, is closed to traffic as part of the Jamestown sanitary sewer project.\u00a0 1st Street SE is closed from a half block west of 7th Ave SE to 7th Ave SE. Work is expected to last until early next week. 7th Ave SE will remain open during this time. Jamestown Plumbing can be accessed via 6th Ave SE.<\/p>\n<p><strong><span style=\"color: #333300;\">19th Ave SE<\/span><\/strong> is closed from the entrance to the Strata Concrete Yard south to 17th St SE.\u00a0Businesses in the area can be accessed from the north via 10th Street SE. Work is expected to last for about two weeks.<\/p>\n<p><strong>10th St SE and 15th Ave SE<\/strong>, near the railroad tracks,\u00a0\u00a0crews will also be working in the area. At this time, no closures are anticipated for this area. However, drivers should use caution. Work is expected to last for about one week.<\/p>\n<p>Updates posted online at jamestownsewerproject.com along with CSiNewsNow.com and on The Wayne Byers Show on CSi Cable 2.\u00a0 Questions on the Jamestown sanitary sewer project can be directed to Darrell Hournbuckle with Interstate Engineering at (701) 252-0234.\u00a0\u00a0\u00a0\u00a0\u00a0 <a title=\"Project Map\" href=\"http:\/\/jamestownsewerproject.com\" target=\"_blank\"><b>JamestownSewerProject.com<\/b><\/a><\/p>\n<p>Photos from work near CSi:<\/p>\n<div class=\"easyRotatorWrapper\" align=\"center\">\r\n\r\n<!-- Begin DWUser_EasyRotator -->\r\n<script type=\"text\/javascript\" src=\"http:\/\/c520866.r66.cf2.rackcdn.com\/1\/js\/easy_rotator.min.js\"><\/script>\r\n<div class=\"dwuserEasyRotator\" style=\"width: 600px; height: 340px; position:relative; text-align: left; background-color: #EBF808;\" data-erConfig=\"{autoplayEnabled:true, lpp:'102-105-108-101-58-47-47-47-67-58-47-85-115-101-114-115-47-79-119-110-101-114-47-68-111-99-117-109-101-110-116-115-47-69-97-115-121-82-111-116-97-116-111-114-80-114-101-118-105-101-119-47-112-114-101-118-105-101-119-95-115-119-102-115-47', wv:1, autoplayDelay:3000}\" data-erName=\"SewerProj1\" data-erTID=\"{3p1kq42p4v3584370889731}\">\r\n\t<div data-ertype=\"content\" style=\"display: none;\"><ul data-erlabel=\"Main Category\">\r\n\t<li>\r\n\t\t<img decoding=\"async\" class=\"main\" src=\"http:\/\/csinewsnow.com\/wp-content\/uploads\/EasyRotatorStorage\/user-content\/erc_38_1379880357\/content\/assets\/SewerProj  8-0.jpg\" \/>\r\n\t\t<img decoding=\"async\" class=\"thumb\" src=\"http:\/\/csinewsnow.com\/wp-content\/uploads\/EasyRotatorStorage\/user-content\/erc_38_1379880357\/content\/assets\/SewerProj  8-0.jpg\" \/>\r\n\t<\/li>\r\n\t<li>\r\n\t\t<img decoding=\"async\" class=\"main\" src=\"http:\/\/csinewsnow.com\/wp-content\/uploads\/EasyRotatorStorage\/user-content\/erc_38_1379880357\/content\/assets\/SewerProj  7-0.jpg\" \/>\r\n\t\t<img decoding=\"async\" class=\"thumb\" src=\"http:\/\/csinewsnow.com\/wp-content\/uploads\/EasyRotatorStorage\/user-content\/erc_38_1379880357\/content\/assets\/SewerProj  7-0.jpg\" \/>\r\n\t<\/li>\r\n\t<li>\r\n\t\t<img decoding=\"async\" class=\"main\" src=\"http:\/\/csinewsnow.com\/wp-content\/uploads\/EasyRotatorStorage\/user-content\/erc_38_1379880357\/content\/assets\/SewerProj  6-0.jpg\" \/>\r\n\t\t<img decoding=\"async\" class=\"thumb\" src=\"http:\/\/csinewsnow.com\/wp-content\/uploads\/EasyRotatorStorage\/user-content\/erc_38_1379880357\/content\/assets\/SewerProj  6-0.jpg\" \/>\r\n\t<\/li>\r\n\t<li>\r\n\t\t<img decoding=\"async\" class=\"main\" src=\"http:\/\/csinewsnow.com\/wp-content\/uploads\/EasyRotatorStorage\/user-content\/erc_38_1379880357\/content\/assets\/SewerProj  4-0.jpg\" \/>\r\n\t\t<img decoding=\"async\" class=\"thumb\" src=\"http:\/\/csinewsnow.com\/wp-content\/uploads\/EasyRotatorStorage\/user-content\/erc_38_1379880357\/content\/assets\/SewerProj  4-0.jpg\" \/>\r\n\t<\/li>\r\n\t<li>\r\n\t\t<img decoding=\"async\" class=\"main\" src=\"http:\/\/csinewsnow.com\/wp-content\/uploads\/EasyRotatorStorage\/user-content\/erc_38_1379880357\/content\/assets\/SewerProj  3-0.jpg\" \/>\r\n\t\t<img decoding=\"async\" class=\"thumb\" src=\"http:\/\/csinewsnow.com\/wp-content\/uploads\/EasyRotatorStorage\/user-content\/erc_38_1379880357\/content\/assets\/SewerProj  3-0.jpg\" \/>\r\n\t<\/li>\r\n\t<li>\r\n\t\t<img decoding=\"async\" class=\"main\" src=\"http:\/\/csinewsnow.com\/wp-content\/uploads\/EasyRotatorStorage\/user-content\/erc_38_1379880357\/content\/assets\/SewerProj  2-0.jpg\" \/>\r\n\t\t<img decoding=\"async\" class=\"thumb\" src=\"http:\/\/csinewsnow.com\/wp-content\/uploads\/EasyRotatorStorage\/user-content\/erc_38_1379880357\/content\/assets\/SewerProj  2-0.jpg\" \/>\r\n\t<\/li>\r\n\t<li>\r\n\t\t<img decoding=\"async\" class=\"main\" src=\"http:\/\/csinewsnow.com\/wp-content\/uploads\/EasyRotatorStorage\/user-content\/erc_38_1379880357\/content\/assets\/SewerProj  1-0.jpg\" \/>\r\n\t\t<img decoding=\"async\" class=\"thumb\" src=\"http:\/\/csinewsnow.com\/wp-content\/uploads\/EasyRotatorStorage\/user-content\/erc_38_1379880357\/content\/assets\/SewerProj  1-0.jpg\" \/>\r\n\t<\/li>\r\n\t<li>\r\n\t\t<img decoding=\"async\" class=\"main\" src=\"http:\/\/csinewsnow.com\/wp-content\/uploads\/EasyRotatorStorage\/user-content\/erc_38_1379880357\/content\/assets\/ConstructionHFS-0.JPG\" \/>\r\n\t\t<img decoding=\"async\" class=\"thumb\" src=\"http:\/\/csinewsnow.com\/wp-content\/uploads\/EasyRotatorStorage\/user-content\/erc_38_1379880357\/content\/assets\/ConstructionHFS-0.JPG\" \/>\r\n\t<\/li>\r\n<\/ul>\r\n<\/div>\r\n\t<div data-ertype=\"layout\" data-ertemplateName=\"NONE\" style=\"\">\t\t\t<div class=\"erimgMain\" style=\"position: absolute; left:0;right:0;top:0;bottom:25px;\" data-erConfig=\"{___numTiles:3, scaleMode:'scaleUpAndDown', imgType:'main', alwaysPreviousButton:true, __loopNextButton:false, __arrowButtonMode:'rollover'}\">\r\n\t\t\t\t<div class=\"erimgMain_slides erFixCSS3\" style=\"position: absolute; left:15px; top:0; bottom:0; right:15px;\">\r\n\t\t\t\t\t<div class=\"erimgMain_slide\">\r\n\t\t\t\t\t\t<div class=\"erimgMain_img\" style=\"position: absolute; left:0;right:0;top:0;bottom:0;\"><\/div>\r\n\t\t\t\t\t<\/div>\r\n\t\t\t\t<\/div>\r\n\t\t\t\t<div class=\"erimgMain_arrowLeft\" style=\"position:absolute; left: 0; top: 50%; margin-top: -15px;\" data-erConfig=\"{image:'circleCozy', image2:'circleCozy'}\"><\/div>\r\n\t\t\t\t<div class=\"erimgMain_arrowRight\" style=\"position:absolute; right: 0; top: 50%; margin-top: -15px;\" data-erConfig=\"{image:'circleCozy', image2:'circleCozy'}\"><\/div>\r\n\t\t\t<\/div>\r\n\t\t\t\r\n\t\t\t<div class=\"erdots\" style=\"overflow: hidden; margin: 0; font-size: 10px; font-family: 'Lucida Grande', 'Lucida Sans', Arial, _sans; color: #FFF; position: absolute; left:0; right:0; bottom:5px;\" data-erConfig=\"{showText:false}\" align=\"center\">\r\n\t\t\t\t<div class=\"erdots_wrap\" style=\"wasbackground-color: #CFC; float: none;\" align=\"left\"> <!-- modify the float on this element to make left\/right\/none=center aligned. -->\r\n\t\t\t\t\t<span class=\"erdots_btn_selected\" style=\"padding-left: 0; width: 12px; height: 12px; display: inline-block; text-align: center; vertical-align: middle; line-height: 20px; margin: 0 0 0 6px; cursor: default; background: url(http:\/\/easyrotator.s3.amazonaws.com\/1\/i\/rotator\/dots\/export\/12_8_666empty.png) top left no-repeat;\">\r\n\t\t\t\t\t\t&nbsp;\r\n\t\t\t\t\t<\/span>\r\n\t\t\t\t\t<span class=\"erdots_btn_normal\" style=\"padding-left: 0; width: 12px; height: 12px; display: inline-block; text-align: center; vertical-align: middle; line-height: 20px; margin: 0 0 0 6px; cursor: pointer; background: url(http:\/\/easyrotator.s3.amazonaws.com\/1\/i\/rotator\/dots\/export\/12_8_666.png) top left no-repeat;\">\r\n\t\t\t\t\t\t&nbsp;\r\n\t\t\t\t\t<\/span>\r\n\t\t\t\t\t<span class=\"erdots_btn_hover\" style=\"padding-left: 0; width: 12px; height: 12px; display: inline-block; text-align: center; vertical-align: middle; line-height: 20px; margin: 0 0 0 6px; cursor: pointer; background: url(http:\/\/easyrotator.s3.amazonaws.com\/1\/i\/rotator\/dots\/export\/12_8_CCC.png) top left no-repeat;\">\r\n\t\t\t\t\t\t&nbsp;\r\n\t\t\t\t\t<\/span>\r\n\t\t\t\t<\/div>\r\n\t\t\t<\/div><div class=\"erabout erFixCSS3\" style=\"color: #FFF; text-align: left; background: #000; background:rgba(0,0,0,0.93); border: 2px solid #FFF; padding: 20px; font: normal 11px\/14px Verdana,_sans; width: 300px; border-radius: 10px; display:none;\">\r\n\t\t\tThis jQuery slider was created with the free <a style=\"color:#FFF;\" href=\"#eraboutlink\" target=\"_blank\">EasyRotator for WordPress<\/a> plugin from DWUser.com.\r\n\t\t\t<br \/><br \/>\r\n\t\t\t<a style=\"color:#FFF;\" href=\"#\" class=\"erabout_ok\">OK<\/a>   \r\n\t\t<\/div>\r\n\t\t<noscript>\r\n\t\t\tRotator powered by <strong>EasyRotator for WordPress<\/strong>, a free and easy jQuery slider builder from DWUser.com.  Please enable JavaScript to view. \r\n\t\t<\/noscript>\r\n\t\t<script type=\"text\/javascript\">\/*Avoid IE gzip bug*\/(function(b,c,d){try{if(!b[d]){b[d]=\"temp\";var a=c.createElement(\"script\");a.type=\"text\/javascript\";a.src=\"http:\/\/easyrotator.s3.amazonaws.com\/1\/js\/nozip\/easy_rotator.min.js\";c.getElementsByTagName(\"head\")[0].appendChild(a)}}catch(e){alert(\"EasyRotator fail; contact support.\")}})(window,document,\"er_$144\");<\/script>\r\n\t\r\n\t<\/div>\r\n<\/div>\r\n<!-- End DWUser_EasyRotator -->\r\n\r\n<\/div>\n<p>Previously reported:<\/p>\n<p>1st Street SE is closed from 2nd Avenue SE to 4th Avenue SE. In addition, 1st Street SE is open to local traffic only from 4th Avenue SE to 7th Avenue SE.<\/p>\n<p>4th Avenue SE will remain open during this time. These closures are expected to be in place for about two weeks.<\/p>\n<p>Also, 2nd Ave NE is OPEN for a half block south of 3rd St NE.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Dec 4:\u00a0\u00a0\u00a0\u00a0Construction crews have filled in the remaining open trench on 3rd Av SW.\u00a0 3rd Av SW is open, from 2nd St SW, north\u00a0to 1st St. The intersection at 1st St &amp; 3rd Av SW is now open. The 2nd St SW bridge remains closed, use the detour to 1st [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":33672,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[14],"tags":[],"class_list":["post-27824","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-jamestown"],"_links":{"self":[{"href":"http:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/posts\/27824","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"http:\/\/csinewsnow.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=27824"}],"version-history":[{"count":188,"href":"http:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/posts\/27824\/revisions"}],"predecessor-version":[{"id":33936,"href":"http:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/posts\/27824\/revisions\/33936"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/media\/33672"}],"wp:attachment":[{"href":"http:\/\/csinewsnow.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=27824"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/csinewsnow.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=27824"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/csinewsnow.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=27824"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}