{"id":4413,"date":"2012-09-24T11:27:11","date_gmt":"2012-09-24T16:27:11","guid":{"rendered":"http:\/\/csinewsnow.com\/?p=4413"},"modified":"2012-09-24T11:27:11","modified_gmt":"2012-09-24T16:27:11","slug":"i-94-ex-205-one-lane-for-bridge-maintenance","status":"publish","type":"post","link":"http:\/\/csinewsnow.com\/?p=4413","title":{"rendered":"I-94 Ex. 205 One Lane, For Bridge Maintenance"},"content":{"rendered":"<p><a href=\"http:\/\/csinewsnow.com\/wp-content\/uploads\/2012\/09\/roadworkI94.png\"><img loading=\"lazy\" decoding=\"async\" class=\"alignright size-thumbnail wp-image-4261\" title=\"roadworkI94\" src=\"http:\/\/csinewsnow.com\/wp-content\/uploads\/2012\/09\/roadworkI94-150x150.png\" alt=\"\" width=\"150\" height=\"150\" \/><\/a>From NDDOT<\/p>\n<p>I-94 overhead bridge at Exit 205 east of Steele will be reduced to one lane during construction project<\/p>\n<p>Beginning Wednesday, September 26, the Robinson interchange overhead bridge on I-94 at Exit 205 east of Steele will be reduced to one lane to allow for bridge maintenance and repair project at the interchange.<\/p>\n<p>During construction:<\/p>\n<ul>\n<li>Motorists may experience brief delays<\/li>\n<li>A 14-foot width restriction will be in place on the bridge<\/li>\n<li>Motorists will be required to stop and take turns when crossing the bridge<\/li>\n<\/ul>\n<p>This projected is expected to be completed in mid-October.<\/p>\n<p>The traveling public should use caution when driving through the construction zone. Motorists should allow extra distance between their vehicles and the vehicles in front of them, use extra caution and obey flaggers and posted signs.<\/p>\n<p>For more information about construction projects and road conditions throughout North Dakota, visit the Travel Information Map on the NDDOT website at <a href=\"http:\/\/www.dot.nd.gov\/travel-info-v2\/\">http:\/\/www.dot.nd.gov\/travel-info-v2\/<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>From NDDOT I-94 overhead bridge at Exit 205 east of Steele will be reduced to one lane during construction project Beginning Wednesday, September 26, the Robinson interchange overhead bridge on I-94 at Exit 205 east of Steele will be reduced to one lane to allow for bridge maintenance and repair [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":4261,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[14,35],"tags":[],"class_list":["post-4413","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-jamestown","category-state"],"_links":{"self":[{"href":"http:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/posts\/4413","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"http:\/\/csinewsnow.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=4413"}],"version-history":[{"count":1,"href":"http:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/posts\/4413\/revisions"}],"predecessor-version":[{"id":4414,"href":"http:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/posts\/4413\/revisions\/4414"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/media\/4261"}],"wp:attachment":[{"href":"http:\/\/csinewsnow.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=4413"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/csinewsnow.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=4413"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/csinewsnow.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=4413"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}