{"id":150155,"date":"2018-07-27T15:46:38","date_gmt":"2018-07-27T20:46:38","guid":{"rendered":"http:\/\/csinewsnow.com\/?p=150155"},"modified":"2018-07-27T15:47:33","modified_gmt":"2018-07-27T20:47:33","slug":"construction-begins-on-8th-ave-sw-in-valley-city","status":"publish","type":"post","link":"https:\/\/csinewsnow.com\/?p=150155","title":{"rendered":"Construction begins on 8th Ave. SW in Valley City"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-medium wp-image-101798\" src=\"http:\/\/csinewsnow.com\/wp-content\/uploads\/2016\/06\/roadwork-300x202.jpg\" alt=\"\" width=\"300\" height=\"202\" srcset=\"https:\/\/csinewsnow.com\/wp-content\/uploads\/2016\/06\/roadwork-300x202.jpg 300w, https:\/\/csinewsnow.com\/wp-content\/uploads\/2016\/06\/roadwork-260x175.jpg 260w, https:\/\/csinewsnow.com\/wp-content\/uploads\/2016\/06\/roadwork.jpg 445w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/>Bismarck\u00a0 (NDDOT) Construction will begin Monday, July 30 on 8<sup>th<\/sup> Ave. SW\/Kathryn Road in Valley City from Winter Show Road south to 14<sup>th<\/sup> St. SW. Construction consists of concrete pavement repair work.<\/p>\n<p>During construction:<\/p>\n<ul>\n<li>Speeds will be reduced to 25 mph<\/li>\n<li>A width restriction of 14 feet will be in place<\/li>\n<li>Traffic will be reduced to one lane of traffic directed by flaggers 24 hours a day until this section of road is complete<\/li>\n<\/ul>\n<p>This segment of the project is expected to be complete in early August.<\/p>\n<p>The NDDOT would like to remind motorists to slow down and use caution throughout the work zone. For more information about construction projects and road conditions throughout North Dakota, call 511 from any type of phone or visit the Travel Information Map on the NDDOT website at <u>\u00a0<\/u><a href=\"http:\/\/www.dot.nd.gov\/travel-info-v2\/\">http:\/\/www.dot.nd.gov\/travel-info-v2\/<\/a><u>.<\/u><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Bismarck\u00a0 (NDDOT) Construction will begin Monday, July 30 on 8th Ave. SW\/Kathryn Road in Valley City from Winter Show Road south to 14th St. SW. Construction consists of concrete pavement repair work. During construction: Speeds will be reduced to 25 mph A width restriction of 14 feet will be in [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":101799,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5],"tags":[],"class_list":["post-150155","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-valley-city"],"_links":{"self":[{"href":"https:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/posts\/150155","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/csinewsnow.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=150155"}],"version-history":[{"count":1,"href":"https:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/posts\/150155\/revisions"}],"predecessor-version":[{"id":150156,"href":"https:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/posts\/150155\/revisions\/150156"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/media\/101799"}],"wp:attachment":[{"href":"https:\/\/csinewsnow.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=150155"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/csinewsnow.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=150155"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/csinewsnow.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=150155"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}