{"id":164366,"date":"2019-02-08T14:16:31","date_gmt":"2019-02-08T20:16:31","guid":{"rendered":"http:\/\/csinewsnow.com\/?p=164366"},"modified":"2019-02-08T14:16:52","modified_gmt":"2019-02-08T20:16:52","slug":"nddot-seeks-comments-stip-valley-city-project","status":"publish","type":"post","link":"https:\/\/csinewsnow.com\/?p=164366","title":{"rendered":"NDDOT seeks comments STIP, Valley City project"},"content":{"rendered":"<p>Bismarck\u00a0 (NDDOT)\u00a0 The North Dakota Department of Transportation (NDDOT) is seeking comments on amendments to the 2019-2022 State Transportation Improvement Program (STIP) for inclusion of previously-unpublished projects in 2019<\/p>\n<ol>\n<li>Milling and asphalt overlay in Devils Lake on 1<sup>st<\/sup> St NE from 6<sup>th<\/sup> Ave to 8<sup>th<\/sup> Ave, 8<sup>th<\/sup> Ave NE from 1<sup>st<\/sup> St to Railroad Ave, and Walnut St E from 8<sup>th<\/sup> Ave to Elks Dr.<\/li>\n<\/ol>\n<p>Total Cost: $1,036,000<\/p>\n<ol start=\"2\">\n<li><strong>Storm Sewer installation in Valley City on Wintershow Rd and 8<sup>th<\/sup> Ave SW.<\/strong><\/li>\n<\/ol>\n<p><strong>Total Cost: $1,586,000<\/strong><\/p>\n<p>&nbsp;<\/p>\n<ol start=\"3\">\n<li>Pipe replacement on the I-29 crossroad at Exit 212.<\/li>\n<\/ol>\n<p>Total Cost: $230,000<\/p>\n<p>&nbsp;<\/p>\n<ol start=\"4\">\n<li>Pipe installation on ND Highway 20 seven miles north of Jamestown.<\/li>\n<\/ol>\n<p>Total Cost: $80,000<\/p>\n<p>&nbsp;<\/p>\n<ol start=\"5\">\n<li>Lighting, pavement marking and signing on US Highway 83 at the junction of 128<sup>th<\/sup> Ave NW at Ruthville north of Minot.<\/li>\n<\/ol>\n<p>Total Cost: $150,000<\/p>\n<p>&nbsp;<\/p>\n<ol start=\"6\">\n<li>Pavement marking and signing in Minot on 3<sup>rd<\/sup> Ave SE &amp; 3<sup>rd<\/sup> St SE and Burdick Expressway &amp; 13<sup>th<\/sup> St SE.<\/li>\n<\/ol>\n<p>Total Cost: $40,000<\/p>\n<p>&nbsp;<\/p>\n<ol start=\"7\">\n<li>Pavement marking and signing in Center on ND Highway 48 &amp; 3<sup>rd<\/sup> St and ND Highway 25 near Pope Ave.<\/li>\n<\/ol>\n<p>Total Cost: $35,000<\/p>\n<p>&nbsp;<\/p>\n<ol start=\"8\">\n<li>Pavement marking, signing, and Dynamic Message Signs on US Highways 2 and 52 from Brooks Junction to south of Velva.<\/li>\n<\/ol>\n<p>Total Cost: $2,750,000<\/p>\n<p>&nbsp;<\/p>\n<ol start=\"9\">\n<li>Pavement marking, signing, and Dynamic Message Signs on US Highway 85 from Watford City to Alexander<\/li>\n<\/ol>\n<p>Total Cost: $1,675,000<\/p>\n<p>&nbsp;<\/p>\n<ol start=\"10\">\n<li>Pavement marking and signing on passing and climbing lanes at various locations on ND Highways 8, 22, and 23.<\/li>\n<\/ol>\n<p>Total Cost: $155,000<\/p>\n<p>&nbsp;<\/p>\n<ol start=\"11\">\n<li>Pavement marking and signing on passing and climbing lanes at various locations on ND Highways 8, 22, 23, 200, and 1804.<\/li>\n<\/ol>\n<p>Total Cost: $420,000<\/p>\n<p>&nbsp;<\/p>\n<ol start=\"12\">\n<li>Milling and asphalt overlay on ND Highway 30 from the junction of ND Highway 66 north to the junction of US Highway 281.<\/li>\n<\/ol>\n<p>Total Cost: $2,400,000<\/p>\n<p>&nbsp;<\/p>\n<p>The public is invited to view the current STIP on the NDDOT\u2019s website at <a href=\"http:\/\/www.dot.nd.gov\">www.dot.nd.gov<\/a> by clicking on \u201cPublications\u201d on the top of the page, then clicking on the \u201c2019-2022 Final STIP (Statewide Transportation Improvement Program)\u201d link under the Plans and Reports section<strong><em>.<\/em><\/strong><\/p>\n<p>&nbsp;<\/p>\n<p>Comments should be sent no later than February 22, 2019 to Chad M. Orn at NDDOT, 608 E Boulevard Ave, Bismarck, ND 58505-0700, or sent via email <a href=\"mailto:corn@nd.gov\">corn@nd.gov<\/a> \u00a0with \u201c2019 State Federal-Aid Roadway Projects\u201d in the subject line.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Bismarck\u00a0 (NDDOT)\u00a0 The North Dakota Department of Transportation (NDDOT) is seeking comments on amendments to the 2019-2022 State Transportation Improvement Program (STIP) for inclusion of previously-unpublished projects in 2019 Milling and asphalt overlay in Devils Lake on 1st St NE from 6th Ave to 8th Ave, 8th Ave NE from [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":31319,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5],"tags":[],"class_list":["post-164366","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-valley-city"],"_links":{"self":[{"href":"https:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/posts\/164366","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/csinewsnow.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=164366"}],"version-history":[{"count":1,"href":"https:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/posts\/164366\/revisions"}],"predecessor-version":[{"id":164367,"href":"https:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/posts\/164366\/revisions\/164367"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/media\/31319"}],"wp:attachment":[{"href":"https:\/\/csinewsnow.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=164366"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/csinewsnow.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=164366"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/csinewsnow.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=164366"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}