{"id":186368,"date":"2019-12-05T14:26:03","date_gmt":"2019-12-05T20:26:03","guid":{"rendered":"http:\/\/csinewsnow.com\/?p=186368"},"modified":"2019-12-05T14:26:03","modified_gmt":"2019-12-05T20:26:03","slug":"nddot-taking-comments-stip-amendments","status":"publish","type":"post","link":"https:\/\/csinewsnow.com\/?p=186368","title":{"rendered":"NDDOT taking comments, STIP amendments"},"content":{"rendered":"<p>Bismarck\u00a0 (NDDOT)\u00a0 The North Dakota Department of Transportation (NDDOT) is seeking comments on amendments to the 2020-2023 State Transportation Improvement Program (STIP) for inclusion of previously unpublished projects in 2020.<\/p>\n<p>&nbsp;<\/p>\n<ol>\n<li>Centerline pipe replacements East of Hurdsfield on ND 200, RP 263.8 to RP 267.2.<\/li>\n<\/ol>\n<p>Total Cost: $820,000<\/p>\n<p>&nbsp;<\/p>\n<ol>\n<li>Centerline pipe backfill repairs North of Lakota on ND 1, RP 181.97 to RP 190.47.<\/li>\n<\/ol>\n<p>Total Cost: $247,200<\/p>\n<p>&nbsp;<\/p>\n<p>The public is invited to view the current STIP on the NDDOT\u2019s website at <a href=\"http:\/\/www.dot.nd.gov\">www.dot.nd.gov<\/a> by clicking on \u201cPublications\u201d on the top of the page, then clicking on the \u201c2020-2023 Final STIP (Statewide Transportation Improvement Program)\u201d link under the Plans and Reports section<strong><em>.<\/em><\/strong><\/p>\n<p>&nbsp;<\/p>\n<p>Comments should be sent no later than December 20, 2019 to Logan Beise at NDDOT, 608 E Boulevard Ave, Bismarck, ND 58505-0700, or sent via email <a href=\"mailto:lsbeise@nd.gov\">lsbeise@nd.gov<\/a> with \u201c2020 State Federal-Aid Roadway Projects\u201d in the subject line.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Bismarck\u00a0 (NDDOT)\u00a0 The North Dakota Department of Transportation (NDDOT) is seeking comments on amendments to the 2020-2023 State Transportation Improvement Program (STIP) for inclusion of previously unpublished projects in 2020. &nbsp; Centerline pipe replacements East of Hurdsfield on ND 200, RP 263.8 to RP 267.2. Total Cost: $820,000 &nbsp; Centerline [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":31319,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[35],"tags":[],"class_list":["post-186368","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-state"],"_links":{"self":[{"href":"https:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/posts\/186368","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/csinewsnow.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=186368"}],"version-history":[{"count":1,"href":"https:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/posts\/186368\/revisions"}],"predecessor-version":[{"id":186369,"href":"https:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/posts\/186368\/revisions\/186369"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/media\/31319"}],"wp:attachment":[{"href":"https:\/\/csinewsnow.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=186368"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/csinewsnow.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=186368"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/csinewsnow.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=186368"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}