{"id":19923,"date":"2013-05-30T15:00:29","date_gmt":"2013-05-30T20:00:29","guid":{"rendered":"http:\/\/csinewsnow.com\/?p=19923"},"modified":"2013-05-30T15:33:57","modified_gmt":"2013-05-30T20:33:57","slug":"corps-cuts-jamestown-dam-release","status":"publish","type":"post","link":"https:\/\/csinewsnow.com\/?p=19923","title":{"rendered":"Corps Ramps Up Jamestown Dam Release"},"content":{"rendered":"<p>Jamestown, ND (KCSi-T.V. News May 30, 2013) &#8212; The U.S. Army Corps of Engineers on Thursday afternoon (May 30, 2013) at 2:45 p.m., increased the release from Jamestown Dam to 1,000 cfs.<\/p>\n<p>Bob Martin reported that the increase puts the Jamestown Dam release to where it was before being cut back due to concerns of excessive rainfall in the forecast.<\/p>\n<p>Earlier this week (Wed) \u00a0the Corps reduced the release back to 850 cfs.<\/p>\n<p>Martin points out that Pipestem Dam is maintaining a release of 200 cfs, for a combined release of 1,200 cfs.<\/p>\n<p>He said no other release changes are planned through the coming weekend, unless it becomes necessary due to rainfall or runoff amounts.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>Previously&#8230;<\/p>\n<p>Jamestown, ND (KCSi-T.V. News May 29, 2013) &#8212; The U.S. Army Corp of Engineers on Wednesday (May 29, 2013) at noon, decreased the Jamestown Dam release from 1,000 cfs, to 850 cfs.<\/p>\n<p>Bob Martin in Jamestown says, the reduction stems from the forecast of possible heavy rainfall amounts in the James River basin in the next few days.<\/p>\n<p>Martin says, the reduction in releases from Jamestown Dam is for an unspecified period of time.<\/p>\n<p>The release from Pipestem Dam remains at 200 cfs, for combined release of 1,050 cfs, down from 1,200 cfs.<\/p>\n<p>The reduction from Jamestown Reservoir drops the James River level downstream of the confluence by about 9 inches.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Jamestown, ND (KCSi-T.V. News May 30, 2013) &#8212; The U.S. Army Corps of Engineers on Thursday afternoon (May 30, 2013) at 2:45 p.m., increased the release from Jamestown Dam to 1,000 cfs. Bob Martin reported that the increase puts the Jamestown Dam release to where it was before being cut [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":2862,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[25,14],"tags":[],"class_list":["post-19923","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-featured","category-jamestown"],"_links":{"self":[{"href":"https:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/posts\/19923","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/csinewsnow.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=19923"}],"version-history":[{"count":5,"href":"https:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/posts\/19923\/revisions"}],"predecessor-version":[{"id":19981,"href":"https:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/posts\/19923\/revisions\/19981"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/media\/2862"}],"wp:attachment":[{"href":"https:\/\/csinewsnow.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=19923"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/csinewsnow.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=19923"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/csinewsnow.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=19923"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}