{"id":22699,"date":"2013-07-10T14:11:50","date_gmt":"2013-07-10T19:11:50","guid":{"rendered":"http:\/\/csinewsnow.com\/?p=22699"},"modified":"2013-07-11T22:25:01","modified_gmt":"2013-07-12T03:25:01","slug":"pipestem-dam-releases-increased-jmst-dam-decreased","status":"publish","type":"post","link":"https:\/\/csinewsnow.com\/?p=22699","title":{"rendered":"Pipestem Dam Releases Up, Jmst Dam Down"},"content":{"rendered":"<p><a href=\"http:\/\/csinewsnow.com\/wp-content\/uploads\/2013\/04\/pipestem1.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-medium wp-image-15828\" alt=\"pipestem1\" src=\"http:\/\/csinewsnow.com\/wp-content\/uploads\/2013\/04\/pipestem1-300x202.jpg\" width=\"300\" height=\"202\" srcset=\"https:\/\/csinewsnow.com\/wp-content\/uploads\/2013\/04\/pipestem1-300x202.jpg 300w, https:\/\/csinewsnow.com\/wp-content\/uploads\/2013\/04\/pipestem1-259x175.jpg 259w, https:\/\/csinewsnow.com\/wp-content\/uploads\/2013\/04\/pipestem1.jpg 445w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a>Omaha, NE (KCSi-T.V. News Jul 10, 2013) &#8212; The U.S. Army Corps of Engineers announces that gate changes at Jamestown and Pipestem Reservoirs were completed Tuesday to increase the rate of drawdown of the Pipestem Reservoir pool.<\/p>\n<p>Pipestem releases were increased from 200 cubic feet per second to 300 cfs, and Jamestown releases were decreased from 700 cfs to 600 cfs.<\/p>\n<p>The gate changes will not result in a change to the combined release of 900 cfs. Jamestown Reservoir\u2019s pool elevation is 1435.6 feet with 6.6 percent of its flood pool occupied.<\/p>\n<p>Inflows are estimated near 200 cfs. Pipestem Reservoir is at pool elevation 1472.4 feet and has 37.6 percent of its flood pool occupied. Inflows are around 80 cfs.<\/p>\n<p>Read more \u2013 on line\u2026 http:\/\/www.nwo.usace.army.mil\/Media\/NewsReleases\/tabid\/1835\/Article\/15945\/jamestown-and-pipestem-reservoirs-update-july-10.aspx<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Omaha, NE (KCSi-T.V. News Jul 10, 2013) &#8212; The U.S. Army Corps of Engineers announces that gate changes at Jamestown and Pipestem Reservoirs were completed Tuesday to increase the rate of drawdown of the Pipestem Reservoir pool. Pipestem releases were increased from 200 cubic feet per second to 300 cfs, [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":15828,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[25,14],"tags":[],"class_list":["post-22699","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-featured","category-jamestown"],"_links":{"self":[{"href":"https:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/posts\/22699","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/csinewsnow.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=22699"}],"version-history":[{"count":5,"href":"https:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/posts\/22699\/revisions"}],"predecessor-version":[{"id":22801,"href":"https:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/posts\/22699\/revisions\/22801"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/media\/15828"}],"wp:attachment":[{"href":"https:\/\/csinewsnow.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=22699"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/csinewsnow.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=22699"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/csinewsnow.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=22699"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}