{"id":229576,"date":"2021-07-09T11:16:32","date_gmt":"2021-07-09T16:16:32","guid":{"rendered":"http:\/\/csinewsnow.com\/?p=229576"},"modified":"2021-07-09T12:10:00","modified_gmt":"2021-07-09T17:10:00","slug":"new-turf-installed-at-hansen-stadium-uj-campus","status":"publish","type":"post","link":"https:\/\/csinewsnow.com\/?p=229576","title":{"rendered":"New Turf installed at Hansen Stadium, UJ Campus"},"content":{"rendered":"<p><a href=\"http:\/\/csinewsnow.com\/wp-content\/uploads\/2021\/07\/UJstad-newturf1.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft  wp-image-229588\" src=\"http:\/\/csinewsnow.com\/wp-content\/uploads\/2021\/07\/UJstad-newturf1-300x202.jpg\" alt=\"\" width=\"471\" height=\"317\" srcset=\"https:\/\/csinewsnow.com\/wp-content\/uploads\/2021\/07\/UJstad-newturf1-300x202.jpg 300w, https:\/\/csinewsnow.com\/wp-content\/uploads\/2021\/07\/UJstad-newturf1-260x175.jpg 260w, https:\/\/csinewsnow.com\/wp-content\/uploads\/2021\/07\/UJstad-newturf1.jpg 445w\" sizes=\"auto, (max-width: 471px) 100vw, 471px\" \/><\/a>(CSi)\u00a0 The new turf at\u00a0 The University of Jamestown&#8217;s Hansen Stadium, Rollie Greeno Field this week was progressing as part of the stadium&#8217;s renovation, expected to be completed in September this year.<\/p>\n<p>The stadium will now include, a nine lane, 400-meter track with new jump and throwing areas.<\/p>\n<p>Other new features include newly installed home side seating including\u00a0 the new press box and suite, along with lighting, and parking lot improvements. and\u00a0 a new video board and sound system.<\/p>\n<p>With the stadium renovations at UJ, plus <a href=\"http:\/\/csinewsnow.com\/?p=224975\">the soon coming Erstad Practice field at Jamestown High School,<\/a> $9.7 million of funds have been raise, and $2 million from the school district toward the $11.7 million project.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>(CSi)\u00a0 The new turf at\u00a0 The University of Jamestown&#8217;s Hansen Stadium, Rollie Greeno Field this week was progressing as part of the stadium&#8217;s renovation, expected to be completed in September this year. The stadium will now include, a nine lane, 400-meter track with new jump and throwing areas. Other new [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":229587,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[14,27],"tags":[],"class_list":["post-229576","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-jamestown","category-sports"],"_links":{"self":[{"href":"https:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/posts\/229576","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/csinewsnow.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=229576"}],"version-history":[{"count":7,"href":"https:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/posts\/229576\/revisions"}],"predecessor-version":[{"id":229601,"href":"https:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/posts\/229576\/revisions\/229601"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/media\/229587"}],"wp:attachment":[{"href":"https:\/\/csinewsnow.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=229576"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/csinewsnow.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=229576"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/csinewsnow.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=229576"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}