{"id":253451,"date":"2022-08-02T09:12:00","date_gmt":"2022-08-02T14:12:00","guid":{"rendered":"http:\/\/csinewsnow.com\/?p=253451"},"modified":"2022-08-07T11:41:09","modified_gmt":"2022-08-07T16:41:09","slug":"mill-hill-construction-lane-changes-august-3","status":"publish","type":"post","link":"https:\/\/csinewsnow.com\/?p=253451","title":{"rendered":"Mill Hill Construction &#8211; Lane Changes"},"content":{"rendered":"<div class=\"wp-block-image\">\n<figure class=\"alignleft size-full is-resized\"><a href=\"http:\/\/csinewsnow.com\/wp-content\/uploads\/2022\/08\/MillHillConst2.jpg\"><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/csinewsnow.com\/wp-content\/uploads\/2022\/08\/MillHillConst2.jpg\" alt=\"\" class=\"wp-image-253458\" width=\"289\" height=\"195\" srcset=\"https:\/\/csinewsnow.com\/wp-content\/uploads\/2022\/08\/MillHillConst2.jpg 445w, https:\/\/csinewsnow.com\/wp-content\/uploads\/2022\/08\/MillHillConst2-300x202.jpg 300w, https:\/\/csinewsnow.com\/wp-content\/uploads\/2022\/08\/MillHillConst2-260x175.jpg 260w\" sizes=\"auto, (max-width: 289px) 100vw, 289px\" \/><\/a><\/figure><\/div>\n\n\n<p>Starting Wednesday, August 3, 2022, traffic control will be switching lanes on the West Business Loop (Mill Hill) construction project. Please note that all lanes will be ground to a smooth surface prior to the completion of the project.<br>The traffic signals at 17th St SW will continue flashing red, constituting a four-way stop, until signals are deemed ready to be turned back on. Traffic will continue to be reduced to one lane each direction.<br>This project is managed by the North Dakota Department of Transportation.<br>Construction signing will be put in place by the Contractor.<br>Motorists should use extreme caution in this area and take alternate routes during this time, if possible.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Starting Wednesday, August 3, 2022, traffic control will be switching lanes on the West Business Loop (Mill Hill) construction project. Please note that all lanes will be ground to a smooth surface prior to the completion of the project.The traffic signals at 17th St SW will continue flashing red, constituting [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":253455,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[25,14],"tags":[],"class_list":["post-253451","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-featured","category-jamestown"],"_links":{"self":[{"href":"https:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/posts\/253451","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/csinewsnow.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=253451"}],"version-history":[{"count":3,"href":"https:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/posts\/253451\/revisions"}],"predecessor-version":[{"id":253750,"href":"https:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/posts\/253451\/revisions\/253750"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/media\/253455"}],"wp:attachment":[{"href":"https:\/\/csinewsnow.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=253451"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/csinewsnow.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=253451"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/csinewsnow.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=253451"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}