{"id":294632,"date":"2025-07-15T09:18:00","date_gmt":"2025-07-15T14:18:00","guid":{"rendered":"http:\/\/csinewsnow.com\/?p=294632"},"modified":"2025-07-15T12:19:27","modified_gmt":"2025-07-15T17:19:27","slug":"phase-2-of-construction-on-us-52-us-281-begins-july-14","status":"publish","type":"post","link":"https:\/\/csinewsnow.com\/?p=294632","title":{"rendered":"Phase 2 of Construction on US 52\/US 281 Begins July 14"},"content":{"rendered":"\n<p>Jamestown &#8211; Phase 2 of Construction on US 52\/US 281 from 37th St SE to 17th St SW Begins July 14<br>Jamestown, ND \u2013 The North Dakota Department of Transportation (NDDOT), in cooperation with TI-Zack Concrete Inc., will begin Phase 2 of the highway improvement project on US 52\/US 281 from 37th Street SE to 17th Street SW in Jamestown on Monday, July 14th, with expected completion by Friday, August 15th, weather permitting.<br>Phase 2 Overview<br>During this phase, construction will take place in the outside lanes and right-turn lanes of US 52\/US 281. The work includes:<br>\u2022<br>Concrete Pavement Repair (CPR)<br>\u2022<br>ADA-compliant pedestrian ramp upgrades<br>These outside and right-turn lanes will be closed during construction.<br>Additionally, there will be a 7-day closure starting on Tuesday, July 15th, for CPR work on the I-94 westbound on-ramp and eastbound off-ramp at Exit 258.<br>Traffic Impacts and Detours<br>\u2022<br>I-94 eastbound motorists should use Exit 260 to turn around and access US 52\/US 281 via Exit 258 during the ramp closure.<br>\u2022<br>US 52\/US 281 northbound and southbound traffic wanting to travel westbound on I-94 will need to use eastbound I-94 to Exit 260, turn around, and head west.<br>Traffic control devices, signs, and flaggers will be used to guide motorists safely through the work zones. Drivers are encouraged to slow down, use caution, and follow detour signage.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Jamestown &#8211; Phase 2 of Construction on US 52\/US 281 from 37th St SE to 17th St SW Begins July 14Jamestown, ND \u2013 The North Dakota Department of Transportation (NDDOT), in cooperation with TI-Zack Concrete Inc., will begin Phase 2 of the highway improvement project on US 52\/US 281 from [&hellip;]<\/p>\n","protected":false},"author":7,"featured_media":179449,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[25],"tags":[],"class_list":["post-294632","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-featured"],"_links":{"self":[{"href":"https:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/posts\/294632","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/csinewsnow.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=294632"}],"version-history":[{"count":2,"href":"https:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/posts\/294632\/revisions"}],"predecessor-version":[{"id":294634,"href":"https:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/posts\/294632\/revisions\/294634"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/csinewsnow.com\/index.php?rest_route=\/wp\/v2\/media\/179449"}],"wp:attachment":[{"href":"https:\/\/csinewsnow.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=294632"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/csinewsnow.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=294632"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/csinewsnow.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=294632"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}