Jamestown  (USACE)  Recent significant rainfall events in the James River Basin has soaked into the soil, and no little accumulations  of water at either the Jamestown or Pipestem Reservoirs.

The U.S. Army Corps of Engineers is continuing minimal releases from Pipestem Dam at 3 cubic feet per second, with no releases from Jamestown Dam.  The two reservoirs are reported at levels projected at winter freezeup.