Jamestown (CSi)  Interstate Engineering reports that after 3 months of work, 2nd Steet Southwest re-opened at the James River bridge after work with the Jamestown sanitary sewer project, that included new pipeing and the sewer lift station in that area.

A temporary gravel surface is in place on the roadway as work there has been suspended for the winter.

The bridge and a portion of 2nd Street SW closed Sept 20.   Traffic to SW Jamestown had detoured to the 1st Street bridge during construction.

Questions on the Jamestown sanitary sewer project can be directed to Darrell Hournbuckle with Interstate Engineering at (701) 252-0234.