Bismarck (NDDOT)  US Highway 52 between 2nd St. N and the JCT of US 281 in Carrington opened Saturday, November 2, following construction work that was taking place.

The temporary detour will be removed and normal traffic operations will resume. The shoulder between JCT US 281 and 2nd St. N will remain closed but will not hinder traffic.

The NDDOT would like to remind motorists to slow down and use caution throughout the work zone. For more information about construction projects and road conditions throughout North Dakota, call 511 from any type of phone or visit the Travel Information Map on the NDDOT website at  http://www.dot.nd.gov/travel-info-v2/