Jamestown (USACE) US Army Corps Pipestem Dam Manager, James Dixon, says Pipestem Reservoir’s water level has gone down about a half foot over the last week enabling closing off releases at Pipestem Dam for the periodic inspection, this week.
Meanwhile, Releases of 40 cfs are continuing from Jamestown Dam with lesser flows on the James River.
The river level Wednesday September 16, 2020, was at 3.35 feet, down from 3.75 a week earlier.
Comments are closed
Sorry, but you cannot leave a comment for this post.