The level of the water behind the Jamestown Dam reached historic level, and began to go into the overflow structure – the Glory Hole – on April 24, 2009. This is video from that day as recorded by CSi TV – The Replay Channel.
Pictures of Jamestown Dam during construction phase 1952
Aerial views of the 2009 flooding Jametown & Pipestem Dams, and surrounding areas, as recorded by CSi TV. Enjoy this 2 minute short video:
Comments are closed
Sorry, but you cannot leave a comment for this post.