Beginning on Monday, September 12, 2022; there will be multiple road closure:

1st St between 4th Ave SE and 5th Ave SW

2nd Ave E from 1st St to 2nd St NE

for approximately two to three weeks. This construction will be phased to have as minimal of an impact as possible. During this time there will be a combination of closures and reduced lanes.
Construction signing will be put in place by the Contractor.
Motorists should use extreme caution in this area and take alternate routes during this time, if possible.