Alex Flanigan of the Corp of Engineers reports the pool elevation at Jamestown Dam is forecasted to reach 1440 feet later this week.  Per the Water Control Manual Jamestown releases are being increased to 700 cfs.  A 150 cfs increase will occur on Monday and a 100 cfs increase will occur on Tuesday.  Pipestem is releasing 300 cfs for a combined release of 1,000 cfs as of Tuesday.  The most probable peak combined release range is 1,000-1,600 cfs.  We will continue to monitor conditions and adjust releases as future rainfall and runoff requires.