Starting Monday, June 24, 2024, there will be road closures for milling, and overlay done as part of the City Street Maintenance Program. This will begin at 8:00 A.M. and is expected to last three (3) days or until completed. Major traffic areas that will be impacted include:

12th Ave NE, from Railroad Drive to 4th St NE

12th Ave NE, from 10th St NE to 13th St NE

15th Ave NE, from 3rd St SE through intersection of 2nd PL NE

3rd & 4th ST NE (UJ Stadium Hill), from 10th Ave NE

4th St NE, from intersection of 12th Ave NE, East to alleyway

4th St NE, from 14th Ave NE, (East to alleyway)

7th ST NE, from East parking lot of Wilson Arena to East UJ Place parking lot

2nd PL NE, from 15th Ave NE to East valley gutter

2nd PL NE, from 11th Ave NE to 12th Ave NE

Railroad Drive, from 11th Ave NE to 12th Ave NE

Alley or roadway between 10th Ave NE to 11th Ave NE

..
Watch for signs posted, remove vehicles and trailers from roadway during this operation.
Motorists and other traffic should use caution when entering these construction areas and consider alternate routes, if possible. The above schedule is contingent upon changing weather conditions.