City crews will begin flushing fire hydrants in the Southeast (SE) and Southwest (SW) areas of the city. This will take place from 8:00 a.m. to 5:00 p.m. beginning on Monday, June 1st, 2026, until completed.
The possibility of lowered water pressure may occur in these areas during these times.
Motorists should use caution in these areas.